This initiative is part of Timor-Leste's efforts to expand energy access and transition to renewable energy, with a focus on delivering solar power and battery energy storage systems to Atauro Island.
The selected consultant will play a critical role in contributing to the pre-EPC phase of the project for Eletricidade de Timor-Leste, Empresa Pública (EDTL,EP), the State-Owned Electricity Company of Timor-Leste.
The consultant is required to demonstrate expertise across in the following areas:
• Conceptual renewable energy system design (solar photovoltaic (PV) and battery energy storage solutions)
• Detailed design of renewable energy infrastructure
• Feasibility studies, risk assessments, and demand verification
• Cost estimation and financial modelling for renewable energy projects
• Familiarity with FIDIC and EPC contract models
• National and international standards and regulations (e.g., IEC, SPLN)
• Stakeholder engagement and management
Request for Proposal (RFP) and Submission Details:
Interested parties may request the RFP document via the following link:
https://www.emailmeform.com/builder/form/78bcqSdUn5J2vYV35
Queries and requests for clarifications regarding the RFP document may be submitted to [email protected] no later than 4:00 PM Timor-Leste time on 14 March 2025.
The deadline for proposal submission is 4:00 PM Timor-Leste time on 26 March 2025. Late submissions will not be accepted.
PROSIVU is funded by the Australian Government and implemented by DT Global.